| Category | Industrial | Manufacturing |
| Location | LaCrosse, IN |
| Services Provided | Plan-Spec |
We are completing improvements to LaCrosse’s existing lagoon-based wastewater treatment system, including a new chlorine contact tank, chlorine tablet feeders, process piping and valves, a solar-powered flow meter, and a new lagoon cover.
Construction includes a nine-foot-deep excavation adjacent to an existing lagoon and creek, requiring extensive dewatering and careful site coordination. We are also assembling and installing the new lagoon cover while the lagoon remains active, carefully sequencing construction to minimize disruption to ongoing wastewater treatment operations.
We’re here to listen, advise, and guide. Let's talk, whether you’re just starting to explore ideas or ready to break ground.
Talk to Our Team